C2007-01 Upgrade Water Treatment System, Power Plant-Farmington Correctional Center

The project includes, but is not limited to, the demolition of steam generators, replacement of existing pumped condensate & make-up water piping systems, the installation of a new reverse osmosis water treatment system, RO water storage tank, RO water feed pumps, & associated structural, plumbing, piping, insulation, power, control, & instrumentation systems.
Addendum #1 (click to expand/collapse)
Name Date Size
C2007-01 Add #1 6/24/2021 1.0 MB