OLD-X2101-01 First Missouri State Capitol State Historic Site Sidewalk & Drainage Improvements

The project consists of replacement of the flagstone sidewalk with a new sidewalk that facilitates pedestrian activities and site visitation, meets ADA requirements, incorporates improvements to the site interpretive center entrance, and conveys storm water away from the historic structure.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 5/14/2021 6.2 MB
01-G-000_Cover Sheet 5/14/2021 338.2 KB
02-G-001_Existing Site Survey 5/14/2021 914.4 KB
03-L-001_Notes & Legends 5/14/2021 451.1 KB
04-L-100_Temporary Traffic Control Plan 5/14/2021 410.0 KB
05-L-110_Demoltion Plan Base Bid 5/14/2021 366.3 KB
06-L-111_Materials Plan Base Bid 5/14/2021 831.2 KB
07-L-112_Grading & Drainage Plan Base Bid 5/14/2021 796.7 KB
08-L-113_Lighting Plan Base Bid 5/14/2021 2.3 MB
09-L-120_Demolition Plan Alt 1 5/14/2021 372.6 KB
10-L-121_Materials Plan Alt 1 5/14/2021 845.7 KB
11-L-122_Grading & Drainage Plan Alt 1 5/14/2021 810.3 KB
12-L-123_Tree Planting Plan Alt 1 5/14/2021 774.2 KB
13-L-510_Details 5/14/2021 497.2 KB