R2008-01 Repairs to Exterior & Parking Lots Troop G Headquarters & Crime Lab
The work includes masonry repairs; exterior waterproofing; replacement of the glazed aluminum curtain wall assemblies to include tinting on the windows; replacing the concrete at the front entrance, steps and sidewalks; removal of existing pavement, rubblizing, and placing in a waste area on site; construction of a new concrete entrance, drive, and parking area with curb and gutters, miscellaneous drainage work; replacement of an existing canopy; and replacement of an existing flagpole and floodlight.
Specifications
(click to expand/collapse)

Name | Date | Size | ||
01-Full Spec | 3/26/2021 | 5.6 MB | ||
02-Division 00 | 3/26/2021 | 3.1 MB | ||
03-Division 01 | 3/26/2021 | 1.0 MB | ||
04-Division 02 | 3/26/2021 | 99.6 KB | ||
05-Division 03 | 3/26/2021 | 137.8 KB | ||
06-Division 04 | 3/26/2021 | 119.0 KB | ||
07-Division 05 | 3/26/2021 | 103.1 KB | ||
08-Division 07 | 3/26/2021 | 136.1 KB | ||
09-Division 08 | 3/26/2021 | 118.5 KB | ||
10-Division 09 | 3/26/2021 | 118.3 KB | ||
11-Division 10 | 3/26/2021 | 99.6 KB | ||
12-Division 22 | 3/26/2021 | 94.8 KB | ||
13-Division 31 | 3/26/2021 | 142.6 KB | ||
14-Division 32 | 3/26/2021 | 208.7 KB | ||
15-Division 33 | 3/26/2021 | 114.1 KB | ||
16-Appendix | 3/26/2021 | 1.5 MB |