O2016-01 / Upgrades to Air Distribution System-Missouri State Capitol
The project includes removing, replacing, and renovating HVAC systems, equipment and components throughout the building.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
01-Full Spec | 1/4/2021 | 12.6 MB | ||
02-Division 00 | 1/4/2021 | 2.7 MB | ||
03-Division 01 | 1/4/2021 | 2.2 MB | ||
04-Division 02 | 1/4/2021 | 3.6 MB | ||
05-Division 03 | 1/4/2021 | 171.8 KB | ||
06-Division 06 | 1/4/2021 | 201.7 KB | ||
07-Division 07 | 1/4/2021 | 236.0 KB | ||
08-Division 09 | 1/4/2021 | 282.4 KB | ||
09-Division 21 | 1/4/2021 | 232.5 KB | ||
10-Division 22 | 1/4/2021 | 318.0 KB | ||
11-Division 23 | 1/4/2021 | 2.7 MB | ||
12-Division 26 | 1/4/2021 | 1.9 MB | ||
13-Division 28 | 1/4/2021 | 133.6 KB |