X1806-01 Wastewater Treatment Systems Replacement-Trail of Tears State Park

The project consists of selective demolition of two wastewater treatment facilities (WWTF) and replacing with new low pressure pipe systems. The work also consists of replacing a degraded storm sewer culvert with a new culvert.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 12/22/2020 38.4 MB
02-Division 00 12/22/2020 3.0 MB
03-Division 01 12/22/2020 372.8 KB
04-Division 02 12/22/2020 128.4 KB
05-Division 03 12/22/2020 153.8 KB
06-Division 31 12/22/2020 145.4 KB
07-Division 32 12/22/2020 143.7 KB
08-Division 33 12/22/2020 332.9 KB
09-Appendices 12/22/2020 34.9 MB