X1806-01 Wastewater Treatment Systems Replacement-Trail of Tears State Park
The project consists of selective demolition of two wastewater treatment facilities (WWTF) and replacing with new low pressure pipe systems. The work also consists of replacing a degraded storm sewer culvert with a new culvert.
Addendum #1
(click to expand/collapse)
Name | Date | Size | ||
X1806-01 Add #1 | 1/22/2021 | 2.8 MB |