X1804-01 Foundation Stabilization Bollinger Mill State Historic Site

The project consists of the restoration of selected portions of the Bollinger Mill building and retaining walls both upstream and downstream of the building. The existing dam and covered bridge are not included in this project.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 12/22/2020 15.8 MB
02-Division 00 12/22/2020 2.5 MB
03-Division 01 12/22/2020 489.2 KB
04-Division 02 12/22/2020 193.1 KB
05-Division 03 12/22/2020 190.0 KB
06-Division 04 12/22/2020 68.3 KB
07-Division 05 12/22/2020 143.2 KB
08-Division 06 12/22/2020 145.9 KB
09-Division 10 12/22/2020 109.6 KB
10-Division 22 12/22/2020 106.6 KB
11-Division 26 12/22/2020 106.4 KB
12-Division 31 12/22/2020 324.1 KB
13-Appendices 12/22/2020 12.7 MB