X1804-01 Foundation Stabilization Bollinger Mill State Historic Site
The project consists of the restoration of selected portions of the Bollinger Mill building and retaining walls both upstream and downstream of the building. The existing dam and covered bridge are not included in this project.
Addendum #1
(click to expand/collapse)
Name | Date | Size | ||
X1804-01 Add #1 | 1/22/2021 | 671.5 KB |
Addendum #2
(click to expand/collapse)
Name | Date | Size | ||
X1804-01 Add #2 | 1/22/2021 | 95.4 KB |
Addendum #3
(click to expand/collapse)
Name | Date | Size | ||
X1804-01 Add #3 | 1/26/2021 | 97.3 KB |
Addendum #4
(click to expand/collapse)
Name | Date | Size | ||
X1804-01 Add #4 | 1/28/2021 | 354.5 KB |