C1911-01 Upgrade HVAC & BAS Community Supervision Center-Missouri Dept of Corrections- Poplar Bluff
The project includes the replacement of 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chilled water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 10/1/2020 | 9.8 MB | ||
01-G-000_Cover Sheet | 10/1/2020 | 1.8 MB | ||
02-M-001_Mech Legend and Notes | 10/1/2020 | 1.3 MB | ||
03-MD-101_Basement Plan Mech Demo | 10/1/2020 | 587.5 KB | ||
04-M-201_First Floor Plan | 10/1/2020 | 650.7 KB | ||
05-M-401_Enlarged Plan | 10/1/2020 | 483.2 KB | ||
06-M-501_Details | 10/1/2020 | 771.5 KB | ||
07-M-502_Chilled Water Schematic | 10/1/2020 | 403.0 KB | ||
08-M-601_Schedules | 10/1/2020 | 745.9 KB | ||
09-M-701_Controls | 10/1/2020 | 734.5 KB | ||
10-E-001_Electrical Legend and Notes | 10/1/2020 | 433.2 KB | ||
11-ED-101_Electrical Demo | 10/1/2020 | 655.0 KB | ||
12-ED-401_Enlarged Electrical Demo | 10/1/2020 | 524.6 KB | ||
13-E-401_Enlarged Plans | 10/1/2020 | 560.8 KB | ||
14-E-501_Equipment Schedule | 10/1/2020 | 675.2 KB |