C1911-01 Upgrade HVAC & BAS Community Supervision Center-Missouri Dept of Corrections- Poplar Bluff

The project includes the replacement of 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chilled water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 10/1/2020 9.8 MB
01-G-000_Cover Sheet 10/1/2020 1.8 MB
02-M-001_Mech Legend and Notes 10/1/2020 1.3 MB
03-MD-101_Basement Plan Mech Demo 10/1/2020 587.5 KB
04-M-201_First Floor Plan 10/1/2020 650.7 KB
05-M-401_Enlarged Plan 10/1/2020 483.2 KB
06-M-501_Details 10/1/2020 771.5 KB
07-M-502_Chilled Water Schematic 10/1/2020 403.0 KB
08-M-601_Schedules 10/1/2020 745.9 KB
09-M-701_Controls 10/1/2020 734.5 KB
10-E-001_Electrical Legend and Notes 10/1/2020 433.2 KB
11-ED-101_Electrical Demo 10/1/2020 655.0 KB
12-ED-401_Enlarged Electrical Demo 10/1/2020 524.6 KB
13-E-401_Enlarged Plans 10/1/2020 560.8 KB
14-E-501_Equipment Schedule 10/1/2020 675.2 KB