C1911-01 Upgrade HVAC & BAS Community Supervision Center-Missouri Dept of Corrections- Poplar Bluff
The project includes the replacement of 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chilled water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Addendum #1
(click to expand/collapse)
Name | Date | Size | ||
C1911-01 Add #1 | 10/14/2020 | 372.6 KB |