C1910-01 Upgrade HVAC & BAS Community Supervision Center-Missouri Department of Corrections-Kennett

The project includes the replacement of 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chilled water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 10/1/2020 5.0 MB
01-G-000_Cover Sheet 10/1/2020 453.8 KB
02-M-001_Mech Legend and Notes 10/1/2020 260.6 KB
03-MD-101_Basement Plan - Mech Demo 10/1/2020 732.9 KB
04-M-201_First Floor Plan 10/1/2020 650.3 KB
05-M-401_Enlarged Plan 10/1/2020 437.9 KB
06-M-501_Details 10/1/2020 549.2 KB
07-M-502_Chilled Water Schematic 10/1/2020 274.9 KB
08-M-601_Schedules 10/1/2020 145.5 KB
09-M-701_Controls 10/1/2020 305.9 KB
10-E-001_Electrical Legend and Notes 10/1/2020 309.1 KB
11-ED-101_Electrical Demo 10/1/2020 554.2 KB
12-ED-401_Enlarged Electrical Demo 10/1/2020 511.3 KB
13-E-401_Enlarged Plans 10/1/2020 318.0 KB
14-E-501_Equipment Schedule 10/1/2020 141.3 KB