C1910-01 Upgrade HVAC & BAS Community Supervision Center-Missouri Department of Corrections-Kennett

The project includes the replacement of 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chilled water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Addendum #1 (click to expand/collapse)
Name Date Size
C1910-01 Add #1 10/14/2020 356.3 KB