T2019-01 Addition & Alterations to FMS Facility
The Work includes, but is not limited to, selective demolition; concrete foundation & slab-on-grade, masonry exterior walls of reinforced concrete masonry units and brick veneer with stone trim; structural steel framing, steel joints and steel deck; metal panel roof, wall, fascia, interior liner panel systems; metal stud framing; thermal insulation; sheathing; paint finishes, doors and hardware; bridge crane and hoist equipment; vehicle exhaust system; HVAC systems; plumbing systems; electrical power and lighting; fire alarm and detection systems. Alternate bids for solar array panel and interior LED replacement.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
00-Very Important MissouriBUYS Instructions Revised 05-26-20 | 8/14/2020 | 112.1 KB | ||
01-Invitation for Bidders and addendum language | 8/14/2020 | 103.2 KB | ||
02-Full Spec | 8/14/2020 | 11.4 MB | ||
03-Division 00 | 8/14/2020 | 2.8 MB | ||
04-Division 01 | 8/14/2020 | 1.4 MB | ||
05-Division 02 | 8/14/2020 | 92.0 KB | ||
06-Division 03 | 8/14/2020 | 587.2 KB | ||
07-Division 04 | 8/14/2020 | 625.7 KB | ||
08-Division 05 | 8/14/2020 | 629.0 KB | ||
09-Division 06 | 8/14/2020 | 546.2 KB | ||
10-Division 07 | 8/14/2020 | 1.2 MB | ||
11-Division 08 | 8/14/2020 | 539.0 KB | ||
12-Division 09 | 8/14/2020 | 128.6 KB | ||
13-Division 10 | 8/14/2020 | 70.5 KB | ||
14-Division 11 | 8/14/2020 | 85.7 KB | ||
15-Division 22 | 8/14/2020 | 875.0 KB | ||
16-Division 23 | 8/14/2020 | 947.9 KB | ||
17-Division 26 | 8/14/2020 | 590.9 KB | ||
18-Division 31 | 8/14/2020 | 155.8 KB | ||
19-Division 32 | 8/14/2020 | 134.1 KB | ||
20-Division 33 | 8/14/2020 | 28.4 KB | ||
21-Division 41 | 8/14/2020 | 100.5 KB | ||
22-Division 48 | 8/14/2020 | 55.7 KB | ||
23-Appendix | 8/14/2020 | 3.3 MB |