T2019-01 Addition & Alterations to FMS Facility
The Work includes, but is not limited to, selective demolition; concrete foundation & slab-on-grade, masonry exterior walls of reinforced concrete masonry units and brick veneer with stone trim; structural steel framing, steel joints and steel deck; metal panel roof, wall, fascia, interior liner panel systems; metal stud framing; thermal insulation; sheathing; paint finishes, doors and hardware; bridge crane and hoist equipment; vehicle exhaust system; HVAC systems; plumbing systems; electrical power and lighting; fire alarm and detection systems. Alternate bids for solar array panel and interior LED replacement.
Addendum #1
(click to expand/collapse)
Name | Date | Size | ||
T2019-01 Add #1 | 9/4/2020 | 546.2 KB |