T2023-01 Field Maintenance Shop Addition-Camp Clark Training Site
The project consists of a new building addition of approximately 2,900 sqft to the north of the existing facility. Including new CMU bearing walls, new steel framing, new standing seam metal roof, new exterior metal wall paneling, new translucent fiberglass sandwich panels, new bridge crane, new heating and ventilation, new vehicle exhaust system, site work and grading, and new lighting.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
00-Very Important MissouriBUYS Instructions Revised 05-26-20 | 8/11/2020 | 112.1 KB | ||
01-Invitation for Bidders and addendum language | 8/11/2020 | 103.2 KB | ||
02-Full Spec | 8/11/2020 | 10.6 MB | ||
03-Division 00 | 8/11/2020 | 2.9 MB | ||
04-Division 01 | 8/11/2020 | 1.0 MB | ||
05-Division 02 | 8/11/2020 | 573.6 KB | ||
06-Division 03 | 8/11/2020 | 624.4 KB | ||
07-Division 04 | 8/11/2020 | 592.5 KB | ||
08-Division 05 | 8/11/2020 | 658.7 KB | ||
09-Division 06 | 8/11/2020 | 569.5 KB | ||
10-Division 07 | 8/11/2020 | 862.3 KB | ||
11-Division 08 | 8/11/2020 | 700.4 KB | ||
12-Division 09 | 8/11/2020 | 602.3 KB | ||
13-Division 10 | 8/11/2020 | 568.6 KB | ||
14-Division 14 | 8/11/2020 | 602.1 KB | ||
15-Division 22 | 8/11/2020 | 1.1 MB | ||
16-Division 23 | 8/11/2020 | 1.3 MB | ||
17-Division 26 | 8/11/2020 | 1.1 MB | ||
18-Division 31 | 8/11/2020 | 557.3 KB | ||
19-Division 32 | 8/11/2020 | 597.3 KB | ||
20-Division 33 | 8/11/2020 | 636.9 KB | ||
21-Division 43 | 8/11/2020 | 560.4 KB | ||
22-Appendices | 8/11/2020 | 3.6 MB |