T2023-01 Field Maintenance Shop Addition-Camp Clark Training Site

The project consists of a new building addition of approximately 2,900 sqft to the north of the existing facility. Including new CMU bearing walls, new steel framing, new standing seam metal roof, new exterior metal wall paneling, new translucent fiberglass sandwich panels, new bridge crane, new heating and ventilation, new vehicle exhaust system, site work and grading, and new lighting.
Specifications (click to expand/collapse)
Name Date Size
00-Very Important MissouriBUYS Instructions Revised 05-26-20 8/11/2020 112.1 KB
01-Invitation for Bidders and addendum language 8/11/2020 103.2 KB
02-Full Spec 8/11/2020 10.6 MB
03-Division 00 8/11/2020 2.9 MB
04-Division 01 8/11/2020 1.0 MB
05-Division 02 8/11/2020 573.6 KB
06-Division 03 8/11/2020 624.4 KB
07-Division 04 8/11/2020 592.5 KB
08-Division 05 8/11/2020 658.7 KB
09-Division 06 8/11/2020 569.5 KB
10-Division 07 8/11/2020 862.3 KB
11-Division 08 8/11/2020 700.4 KB
12-Division 09 8/11/2020 602.3 KB
13-Division 10 8/11/2020 568.6 KB
14-Division 14 8/11/2020 602.1 KB
15-Division 22 8/11/2020 1.1 MB
16-Division 23 8/11/2020 1.3 MB
17-Division 26 8/11/2020 1.1 MB
18-Division 31 8/11/2020 557.3 KB
19-Division 32 8/11/2020 597.3 KB
20-Division 33 8/11/2020 636.9 KB
21-Division 43 8/11/2020 560.4 KB
22-Appendices 8/11/2020 3.6 MB