T2023-01 Field Maintenance Shop Addition-Camp Clark Training Site

The project consists of a new building addition of approximately 2,900 sqft to the north of the existing facility. Including new CMU bearing walls, new steel framing, new standing seam metal roof, new exterior metal wall paneling, new translucent fiberglass sandwich panels, new bridge crane, new heating and ventilation, new vehicle exhaust system, site work and grading, and new lighting.
  Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 8/11/2020 15.4 MB
01-G001_Cover Sheet 8/11/2020 94.4 KB
02-G002_General Information 8/11/2020 527.4 KB
03-G003_Code Footprint and Review 8/11/2020 238.0 KB
04-G004_Site Survey 8/11/2020 293.6 KB
05-G005_Construction Limits 8/11/2020 238.2 KB
06-C001_General Notes 8/11/2020 601.9 KB
07-C010_General Layout Plan 8/11/2020 359.3 KB
08-C020_Demolition Plan 8/11/2020 497.6 KB
09-C030_Erosion Control Plan 8/11/2020 429.5 KB
10-C100_Dimension Plan 8/11/2020 336.1 KB
11-C200_Grading Plan 8/11/2020 375.9 KB
12-C210_Site Details 8/11/2020 511.1 KB
13-C300_Utility Plan 8/11/2020 451.3 KB
14-C310_Utility Details 8/11/2020 507.8 KB
15-D100_Demolition Plan 8/11/2020 942.6 KB
16-A100_Floor Plan 8/11/2020 254.9 KB
17-A101_Roof Plan 8/11/2020 254.1 KB
18-A200_West Elevation 8/11/2020 230.7 KB
19-A201_East Elevation 8/11/2020 237.3 KB
20-A202_North Elevation 8/11/2020 237.8 KB
21-A203_South Elevation 8/11/2020 230.9 KB
22-A220_Building Sections 8/11/2020 537.6 KB
23-A310_Enlarged Plan Details 8/11/2020 325.0 KB
24-A400_Ceiling Plan 8/11/2020 297.0 KB
25-A500_Wall Sections 8/11/2020 347.9 KB
26-A520_Section Details 8/11/2020 366.2 KB
27-A521_Section Details 8/11/2020 333.9 KB
28-A530_Roof Details 8/11/2020 314.9 KB
29-A700_Door Details 8/11/2020 257.7 KB
30-A710_Translucent Panel Details 8/11/2020 262.8 KB
31-S001_General Notes 8/11/2020 211.8 KB
32-S002_CMU Details 8/11/2020 503.8 KB
33-S100_Foundation Plan 8/11/2020 548.8 KB
34-S101_Roof Framing Plan 8/11/2020 532.2 KB
35-S102_Solar Array Frame 8/11/2020 300.3 KB
36-S200_Foundation Sections 8/11/2020 409.5 KB
37-S300_Roof Framing Sections 8/11/2020 447.7 KB
38-GM001_General Mechanical Information 8/11/2020 144.5 KB
39-M100_Plan 8/11/2020 158.1 KB
40-M400_Section and Elevation 8/11/2020 155.7 KB
41-M500_Control Diagrams 8/11/2020 184.4 KB
42-M600_Details 8/11/2020 155.9 KB
43-M601_Details 8/11/2020 176.0 KB
44-M700_Schedules 8/11/2020 134.0 KB
45-P100_Sanitary Plumbing Plan 8/11/2020 134.9 KB
46-P110_Water Plumbing Plan 8/11/2020 145.1 KB
47-P500_Diagrams 8/11/2020 138.3 KB
48-P600_Details 8/11/2020 198.2 KB
49-P601_Details 8/11/2020 185.0 KB
50-P700_Schedules 8/11/2020 123.8 KB
51-GE001_Electrical General Information 8/11/2020 153.3 KB
52-ED101_Demolition Plan 8/11/2020 670.9 KB
53-ED102_Demolition Plan Alternate 2 8/11/2020 718.0 KB
54-ES100_Site Lighting Photometrics Plan Alternate 3 8/11/2020 233.3 KB
55-ES101_Site Lighting Power Plan Alternate 3 8/11/2020 503.9 KB
56-E101_Lighting Plan 8/11/2020 152.8 KB
57-E102_Lighting Plan Alternate 2 8/11/2020 756.8 KB
58-E103_Interior Photometrics Plan Alternate 2 8/11/2020 2.3 MB
59-E201_Power Plan 8/11/2020 204.4 KB
60-E202_Roof Power Plan Alternate 1 8/11/2020 203.6 KB
61-E501_Diagrams 8/11/2020 182.4 KB
62-E601_Details 8/11/2020 154.1 KB
63-E602_Details 8/11/2020 426.5 KB
64-E603_Site Lighting Schedules and Details 8/11/2020 153.2 KB
65-E604_Site Lighting Schedules and Details 8/11/2020 491.8 KB
66-E701_Schedules 8/11/2020 173.5 KB
67-E702_Schedules 8/11/2020 137.0 KB