T2023-01 Field Maintenance Shop Addition-Camp Clark Training Site

The project consists of a new building addition of approximately 2,900 sqft to the north of the existing facility. Including new CMU bearing walls, new steel framing, new standing seam metal roof, new exterior metal wall paneling, new translucent fiberglass sandwich panels, new bridge crane, new heating and ventilation, new vehicle exhaust system, site work and grading, and new lighting.
Addendum #1 (click to expand/collapse)
Name Date Size
T2023-01 Add #1 8/26/2020 1.4 MB