T1930-01 Const New Fitness Center, Camp Clark Training Site

The project includes the construction of a new Fitness Center-Storm Shelter and all associated site, structural, mechanical, electrical, and plumbing work.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 8/11/2020 15.9 MB
01-G-001_Cover Sheet and Index of Drawings 8/11/2020 380.3 KB
02-G-002_Life Safety Plan and Code Analysis 8/11/2020 923.4 KB
03-C-101_Topographic Survey 8/11/2020 599.2 KB
04-C-102_Site Plan 8/11/2020 945.1 KB
05-C-103_Grading, Drainage and Erosion Control Plan 8/11/2020 1.3 MB
06-C-104_Utility Plan 8/11/2020 863.2 KB
07-C-501_Details 8/11/2020 613.3 KB
08-C-502_Details 8/11/2020 639.9 KB
09-S-001_General Notes 8/11/2020 852.3 KB
10-S-002_General Notes, Abbrevs, Misc 8/11/2020 783.2 KB
11-S-101_Foundation and Roof Plans 8/11/2020 498.3 KB
12-S-201_Exterior Wall Elevations 8/11/2020 492.4 KB
13-S-301_Sections 8/11/2020 721.2 KB
14-A-001_Symbols, Abbrevs and Notes 8/11/2020 331.7 KB
15-A-101_Floor and Dimension Plans 8/11/2020 910.8 KB
16-A-111_Roof Plan, RCP Plan and Details 8/11/2020 528.5 KB
17-A-201_Building Elevations and Sections 8/11/2020 621.5 KB
18-A-311_Wall Sections and Details 8/11/2020 810.5 KB
19-A-401_Enlarged Plan, Interior Elevations and Details 8/11/2020 815.5 KB
20-A-402_Interior Elevations and Details 8/11/2020 400.9 KB
21-A-501_Details 8/11/2020 917.2 KB
22-A-601_Partition Types and Details 8/11/2020 555.2 KB
23-A-611_Schedules and Details 8/11/2020 582.9 KB
24-I-101_Finish Schedules, Equipment Plan and Details 8/11/2020 697.8 KB
25-I-111_Signage Plan, Schedule and Details 8/11/2020 785.3 KB
26-MPE-101_Symbols Legend 8/11/2020 438.6 KB
27-M-101_Plan and Schedules 8/11/2020 540.7 KB
28-M-401_Details 8/11/2020 555.8 KB
29-P-101_Plumbing and Fire Protection Plans 8/11/2020 675.1 KB
30-P-401_Schedules and Details 8/11/2020 539.8 KB
31-E-100_Site Plan 8/11/2020 556.8 KB
32-E-101_Plans 8/11/2020 1.0 MB
33-E-401_Details and Schedules 8/11/2020 541.4 KB