Y2003-01 Old Bevier Ph III Maintenance Project

The project includes coal mine reclamation and acid mine drainage treatment maintenance activities including the following: mix organic material piles; excavate earthen berms; install PVC piping, rock and organic material; grade, lime, seed, fertilize and mulch all work areas; and other related work all in accordance with the enclosed plans and specifications. The existing mine drainage has been treated, discharged, and bypassed already. LRP is taking responsibility for testing and treating discharge water in the treatent system during this project.
Specifications (click to expand/collapse)
Name Date Size
00-Very Important MissouriBUYS Instructions Revised 05-26-20 8/6/2020 112.1 KB
01-Page 3 of 3 of Invitation for Bidders and addendum language - OEO 8/6/2020 103.2 KB
02-Full Spec 8/6/2020 3.0 MB
03-Division 00 8/6/2020 2.5 MB
04-Division 01 8/6/2020 1.0 MB
05-Division 31 8/6/2020 662.2 KB
06-Division 32 8/6/2020 806.7 KB
07-Appendix 8/6/2020 193.6 KB