X2002-01 Castlewood State Park Streambank Restoration Ph I

The project consists of bank stabilization and riparian buffer planting. The work includes the uprooting and processing of trees left standing in the disturbance limits, installation of boulder toe with live brush layering, on-site transportation and installation of root wads, and native riparian vegetation installation.

Status

Bidding Closed

Prebid Date5/21/20 11:00am

Bid Date6/4/20 1:30pm

Company & Contacts

The State of Missouri Office of Administration
Leanne Mattern  
573-751-8618

Location

Ballwin, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a refundable deposit of $30, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $30 that can be paid via credit card.

All bids should be submitted using Missouri Buys at THIS WEBSITE.