T2214-01 Construct Company Headuarters & Administration Supply Building-Macon Training Site

The project includes construction of a Headquarters/Administration Building and all associated site work including (but not limited to) erosion control measures, sidewalks, building pad preparation, utility connections, rough & final grading and establishment of landscape materials.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 7/28/2022 12.5 MB
01-G-001_Cover Sheet, Index of Drawings and Location Map 7/28/2022 430.4 KB
02-G-002_Life Safety Plan and Code Analysis 7/28/2022 573.6 KB
03-C-001_Civil Notes 7/28/2022 505.2 KB
04-C-002_Erosion Control and Grading Plan 7/28/2022 751.0 KB
05-C-003_Utility Plan - Base Bid 7/28/2022 601.0 KB
06-C-004_Site Plan - Base Bid 7/28/2022 589.1 KB
07-C-005_Utility and Site Plan - Alternate 1 7/28/2022 716.6 KB
08-S-100_Cover and General Structural Data 7/28/2022 629.8 KB
09-S-200_Foundation Plan 7/28/2022 516.5 KB
10-S-210_Foundation Details 7/28/2022 682.3 KB
11-A-001_Symbols, Abbreviations and Notes 7/28/2022 338.9 KB
12-A-101_Floor, Reflected Ceiling and Roof Plans 7/28/2022 856.3 KB
13-A-201_Building Sections, Elevations and Details 7/28/2022 839.8 KB
14-A-202_Interior Elevations, Finish Schedule and Details 7/28/2022 661.6 KB
15-A-301_Wall Sections and Details 7/28/2022 1.0 MB
16-A-501_Partition Types and Details 7/28/2022 549.9 KB
17-A-601_Door and Window Schedules and Details 7/28/2022 480.0 KB
18-MEP-101_MEP Cover Sheet 7/28/2022 395.2 KB
19-M-101_HVAC Plan 7/28/2022 596.8 KB
20-M-101A_HVAC Plan Alternate 7/28/2022 525.8 KB
21-M-501_HVAC Details and Schedules 7/28/2022 919.3 KB
22-E-101_Power Plan 7/28/2022 540.6 KB
23-E-102_Lighting Plan 7/28/2022 565.2 KB
24-E-501_Electrical Details and Schedules 7/28/2022 651.5 KB
25-F-101_Fire Alarm Plan 7/28/2022 468.7 KB
26-P-101_Sanitary Sewer Plan 7/28/2022 456.7 KB
27-P-102_Water Plan 7/28/2022 532.7 KB
28-P-501_Plumbing Details and Schedules 7/28/2022 589.1 KB