C1922-01 Replace Roof System, Multiple Assets-Farmington Correctional Center

The project includes the complete tear-off of the existing shingle roofing system, removal of existing dormers, repair of existing wood soffits and fascia and installation of a new standing seam metal roofing system at seven (7) buildings located at Farmington Correctional Center (FCC). The buildings included in this project include the following: Medical Building #16, Food Service Building #17 A-side, Education Building #18 (Alternate #1), Library Building #19 (Alternate #2), Boot Camp Building #31 (Alternate #3), Chapel Building #32 B-Side, and Warehouse Building #33 B-Side (Alternate #4).
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 6/21/2022 5.9 MB
02-Division 00 6/21/2022 3.8 MB
03-Division 01 6/21/2022 1.7 MB
04-Division 02 6/21/2022 1.2 MB
05-Division 06 6/21/2022 1.2 MB
06-Division 07 6/21/2022 1.5 MB
07-Division 09 6/21/2022 1.2 MB
08-Division 23 6/21/2022 1.5 MB
09-Division 26 6/21/2022 1.4 MB
10-Appendix 6/21/2022 850.2 KB