O2015-01 Repair Building Exterior-Howerton State Office Building

The project consists of removal of exterior finish material, sheathing, & windows and installation of new glass mat sheathing, Exterior Insulation Finish System with Moisture Drainage System and windows.
Addendum #1 (click to expand/collapse)
Name Date Size
O2015-01 Add #1 7/6/2022 484.5 KB
Addendum #2 (click to expand/collapse)
Name Date Size
O2015-01 Add #2 7/11/2022 234.3 KB