X1807-01 Water System Improvements Bennett Spring State Park

The project consists of highway road bores, wet taps, waterline connection to Laclede PWSD #1 along with new meter, pressure reducing valves, backflow prevention, main valve arrangement with pressure sustaining valve, a booster station, and the construction of water lines; complete with appurtenances, disinfection, a tracer wire system, plus pressure & leakage tests.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 6/9/2022 6.8 MB
02-Division 00 6/9/2022 3.5 MB
03-Division 01 6/9/2022 1.5 MB
04-Division 02 6/9/2022 1.1 MB
05-Division 03 6/9/2022 194.8 KB
06-Division 22 6/9/2022 99.4 KB
07-Division 26 6/9/2022 108.6 KB
08-Division 31 6/9/2022 108.0 KB
09-Division 32 6/9/2022 201.6 KB
10-Division 33 6/9/2022 126.4 KB
11-Appendix 6/9/2022 1.5 MB