M1909-01 Replace HVAC, BAS, & Domestic Hot Water System-Higginsville Habilitation Center
The project includes the replacement of major HVAC equipment to include system Fan Coil units, Air Handling Units, Boilers, Chiller, piping, system controls, and Domestic Hot Water Heating systems.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
01-Full Spec | 4/29/2022 | 9.7 MB | ||
02-Division 00 | 4/29/2022 | 3.1 MB | ||
03-Division 01 | 4/29/2022 | 1.0 MB | ||
04-Division 02 | 4/29/2022 | 1.1 MB | ||
05-Division 03 | 4/29/2022 | 667.5 KB | ||
06-Division 07 | 4/29/2022 | 640.2 KB | ||
07-Division 08 | 4/29/2022 | 732.5 KB | ||
08-Division 22 | 4/29/2022 | 905.9 KB | ||
09-Division 23 | 4/29/2022 | 2.3 MB | ||
10-Division 26 | 4/29/2022 | 751.0 KB | ||
11-Appendix | 4/29/2022 | 4.2 MB |