M1909-01 Replace HVAC, BAS, & Domestic Hot Water System-Higginsville Habilitation Center

The project includes the replacement of major HVAC equipment to include system Fan Coil units, Air Handling Units, Boilers, Chiller, piping, system controls, and Domestic Hot Water Heating systems.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 4/29/2022 7.5 MB
01-G-001_Cover Sheet 4/29/2022 321.3 KB
02-C-101_Site Plan 4/29/2022 431.1 KB
03-H-101_Haz Mat Plan Edu Bldg 1st Floor 4/29/2022 433.7 KB
04-H-102_Haz Mat Plan Edu Bldg Boiler and Mech Room 4/29/2022 477.3 KB
05-H-103_Haz Mat Plan Natatorium 4/29/2022 421.6 KB
06-M-001_Mech Legend and Notes 4/29/2022 655.3 KB
07-MD-101_Demo Plan Edu Bldg Tunnel 4/29/2022 497.7 KB
08-MD-102_Demo Plan Edu Bldg 1st Floor 4/29/2022 502.9 KB
09-MD-103_Demo Plan Edu Bldg Boiler and Mech Room 4/29/2022 583.1 KB
10-MD-104_Demo Plan Natatorium 4/29/2022 487.5 KB
11-M-101_Mech Plan Edu Bldg Tunnel 4/29/2022 462.2 KB
12-M-102_Mech Plan Edu Bldg 1st Floor 4/29/2022 534.3 KB
13-M-103_Mech Plan Edu Bldg Boiler and Mech Room 4/29/2022 600.9 KB
14-M-104_Mech Plan Natatorium 4/29/2022 514.9 KB
15-M-501_Mech Details - Controls 4/29/2022 597.4 KB
16-M-502_Mech Details - Controls 4/29/2022 543.8 KB
17-M-503_Mech Details - Controls 4/29/2022 590.7 KB
18-M-504_Mech Details - Controls 4/29/2022 410.8 KB
19-M-601_Mech Schedules 4/29/2022 665.6 KB
20-M-602_Mech Schedules 4/29/2022 666.5 KB
21-P-101_Plumbing Plan Edu Bldg 1st Floor 4/29/2022 536.1 KB
22-P-102_Plumbing Plan Edu Bldg Boiler and Mech Room 4/29/2022 620.8 KB
23-P-103_Plumbing Plan Natatorium 4/29/2022 537.6 KB
24-P-501_Plumbing Details 4/29/2022 448.7 KB
25-E-101_Electrical Plan Edu Bldg 1st Floor 4/29/2022 568.2 KB
26-E-102_Electrical Plan Edu Bldg Boiler and Mech Room 4/29/2022 579.2 KB
27-E-103_Electrical Plan Natatorium 4/29/2022 495.5 KB
28-E-601_Electrical Schedules and Diagrams 4/29/2022 564.9 KB