O2011-01 Chiller Replacement James C. Kirkpatrick State Information Center

The Work consists of modifications to the existing hydronic cooling system, removal and replacement of hydronic pumps, controls upgrades, replacement of one existing chiller, and selected alternates.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 3/29/2022 6.1 MB
02-Division 00 3/29/2022 3.3 MB
03-Division 01 3/29/2022 1.1 MB
04-Division 02 3/29/2022 125.9 KB
05-Division 22 3/29/2022 132.2 KB
06-Division 23 3/29/2022 1.0 MB
07-Division 26 3/29/2022 489.4 KB