O2011-01 Chiller Replacement James C. Kirkpatrick State Information Center

The Work consists of modifications to the existing hydronic cooling system, removal and replacement of hydronic pumps, controls upgrades, replacement of one existing chiller, and selected alternates.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 3/29/2022 3.2 MB
01-G001_Cover Sheet 3/29/2022 217.7 KB
02-G002_Index Sheet 3/29/2022 543.6 KB
03-MEP001_MEP Symbols List 3/29/2022 376.0 KB
04-D101_Basement Mechanical Room Demo 3/29/2022 613.1 KB
05-D102_Basement Demo 3/29/2022 397.5 KB
06-D103_Level 1 Mechanical Room Demo 3/29/2022 407.9 KB
07-D104_Penthouse North Mech Room Demo 3/29/2022 402.0 KB
08-D105_Penthouse South Mech Room Demo 3/29/2022 381.4 KB
09-D201_Basement Mech Room Isometric 3/29/2022 624.7 KB
10-D202_Penthouse North Mech Room Isometric 3/29/2022 416.0 KB
11-D401_Demo Chilled Water Piping Schematic 3/29/2022 484.9 KB
12-M101_Basement Mech Room 3/29/2022 623.9 KB
13-M102_Basement Floor Plan 3/29/2022 380.1 KB
14-M103_Level 1 Mech Room Plan 3/29/2022 406.7 KB
15-M104_Penthouse North Mech Room Plan 3/29/2022 386.5 KB
16-M105_Penthouse South Mech Room Plan 3/29/2022 381.1 KB
17-M201_Basement Mech Room Isometric 3/29/2022 516.5 KB
18-M202_Penthouse North Mech Room Isometric 3/29/2022 378.0 KB
19-M401_New Chilled Water Piping Schematic 3/29/2022 468.7 KB
20-M501_Mechanical Details 3/29/2022 421.5 KB
21-M601_Mechanical Schedules 3/29/2022 355.4 KB
22-M701_Controls Sequence of Operations 3/29/2022 393.4 KB
23-E101_Basement Mech Room 3/29/2022 631.6 KB
24-E102_Basement Electrical Plan 3/29/2022 379.6 KB
25-E103_Level 1 Mech Room Plan 3/29/2022 411.8 KB
26-E104_Penthouse North Mech Room Plan 3/29/2022 388.6 KB
27-E105_Penthouse South Mech Room Plan 3/29/2022 380.3 KB
28-E601_Electrical Demo One-Line 3/29/2022 409.5 KB
29-E602_Electrical One-Line Diagram 3/29/2022 409.1 KB