N2101-01 Parking Lot/Sidewalks/ADA Compliance Rehabilitation Missouri Lottery Headquarters
The project includes removing the existing parking lot pavement and sidewalks. The pavement and sidewalks will be replaced as shown in the Contract Documents. Storm sewer systems will be replaced as shown on the Construction Plans. A modified MoDOT Type B gutter will be installed as shown on the Construction Plans. Provide all labor, equipment, and materials necessary for complete removal and replacement of work including restoration of disturbed areas.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 3/22/2022 | 5.4 MB | ||
01-G-001_Cover Sheet | 3/22/2022 | 170.5 KB | ||
02-G-002_General Notes | 3/22/2022 | 306.4 KB | ||
03-C-001_Demo Plan | 3/22/2022 | 791.1 KB | ||
04-C-002_Base Bid and Alternate Layout | 3/22/2022 | 1.2 MB | ||
05-C-101_Site Plan | 3/22/2022 | 915.2 KB | ||
06-C-102_Joint Plan | 3/22/2022 | 937.6 KB | ||
07-C-501_Details | 3/22/2022 | 305.2 KB | ||
08-C-502_Entrance Details | 3/22/2022 | 374.6 KB | ||
09-C-503_Elevation Details | 3/22/2022 | 1.1 MB | ||
10-C-801_Phasing Plan | 3/22/2022 | 478.3 KB | ||
11-C-802_Phasing Plan | 3/22/2022 | 408.5 KB | ||
12-C-803_Erosion Control | 3/22/2022 | 1.2 MB |