N2101-01 Parking Lot/Sidewalks/ADA Compliance Rehabilitation Missouri Lottery Headquarters

The project includes removing the existing parking lot pavement and sidewalks. The pavement and sidewalks will be replaced as shown in the Contract Documents. Storm sewer systems will be replaced as shown on the Construction Plans. A modified MoDOT Type B gutter will be installed as shown on the Construction Plans. Provide all labor, equipment, and materials necessary for complete removal and replacement of work including restoration of disturbed areas.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 3/22/2022 5.4 MB
01-G-001_Cover Sheet 3/22/2022 170.5 KB
02-G-002_General Notes 3/22/2022 306.4 KB
03-C-001_Demo Plan 3/22/2022 791.1 KB
04-C-002_Base Bid and Alternate Layout 3/22/2022 1.2 MB
05-C-101_Site Plan 3/22/2022 915.2 KB
06-C-102_Joint Plan 3/22/2022 937.6 KB
07-C-501_Details 3/22/2022 305.2 KB
08-C-502_Entrance Details 3/22/2022 374.6 KB
09-C-503_Elevation Details 3/22/2022 1.1 MB
10-C-801_Phasing Plan 3/22/2022 478.3 KB
11-C-802_Phasing Plan 3/22/2022 408.5 KB
12-C-803_Erosion Control 3/22/2022 1.2 MB