T2120-01 Chiller Plant Improvements-Building #29 Springfield AVCRAD Campus
The project includes cross-connection of the existing chilled water plants & staging system chillers, all required mechanical system upgrades including piping, pumps & DDC control updates.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 3.8 MB | ||
01-CVR_Cover Sheet | 1.0 MB | ||
02-M001_General Mechanical Information | 288.6 KB | ||
03-M101_Platform Level Plan | 860.7 KB | ||
04-M500_Controls Diagram | 334.3 KB | ||
05-M501_Controls Diagram | 753.2 KB | ||
06-M600_Mechanical Details | 739.4 KB | ||
07-M700_Mechanical Schedules | 286.3 KB |