R2110-01 CHANGE IN SCOPE REBID HVAC Repairs, Multiple Assets MSHP General Headquarters
The project consists of on the Academy Administration Building replacing the existing 2-pipe roof-mounted air handling units (AHU-3 & AHU-4) with variable speed-controlled supply and return fans are to be replaced with new similar systems. The existing roof dunnage will be utilized to support the new units. Sections of the existing chilled water/hot water hydronic piping located above the central corridor of the Academy Administration Building will be replaced. New digital BacNet compatible control system consisting of unit controller interface devices, unit controllers, and temperature sensors will replace the existing digital system and will be fully integrated into the existing Building Management System. (Alternate #1) On the Academy Physical Training Building the existing 2-pipe roof-mounted air handling unit (AHU-6) with variable speed controlled supply and return fans are to be replaced with a new similar system. The existing roof dunnage will be utilized to support the new units
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 3/7/2022 | 10.5 MB | ||
01-G-001_Cover Sheet | 3/7/2022 | 556.4 KB | ||
02-M-001_Site Plan | 3/7/2022 | 647.0 KB | ||
03-M-101_Acad Admin Bldg Demo First Floor Plan | 3/7/2022 | 1.1 MB | ||
04-M-102_Acad Admin Bldg Demo Roof Plan | 3/7/2022 | 873.0 KB | ||
05-M-103_Acad Admin Bldg First Floor Plan | 3/7/2022 | 916.4 KB | ||
06-M-104_Acad Admin Bldg Roof Plan | 3/7/2022 | 833.0 KB | ||
07-M-105_Physical Training Demo Roof Plan | 3/7/2022 | 902.7 KB | ||
08-M-106_Physical Training Roof Plan | 3/7/2022 | 704.0 KB | ||
09-M-601_General Notes and Legends | 3/7/2022 | 447.2 KB | ||
10-M-602_Schedules and Details | 3/7/2022 | 591.3 KB | ||
11-M-603_AA PT Diagrams and Sequence of Control | 3/7/2022 | 648.8 KB | ||
12-M-604_Schedules and Details | 3/7/2022 | 590.1 KB | ||
13-E-101_Academy Admin Elec First Floor Plan | 3/7/2022 | 751.6 KB | ||
14-E-102_Physical Training Demo and New Roof Plans | 3/7/2022 | 731.2 KB | ||
15-E-601_Equipment Data Schedule | 3/7/2022 | 459.5 KB |