Rebid R2109-01 Relace & Install Generator MSHP General Headquarters
The project includes providing full backup power to the MSHP General Headquarters Waggoner Building. The building will receive a 400kW generator with a step-up, medium voltage transformer & transfer switch. The new generator & listed equipment is pad mounted on the west lawn of the Waggoner Building. Removal of the existing 600A transfer switch and 115kW gas generator inside the Waggoner Building, plus associated architectural work are also part of the scope.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 1/28/2022 | 3.8 MB | ||
01-G-001_Cover Sheet | 1/28/2022 | 433.2 KB | ||
02-V-101_Topographic Survey HQ Building | 1/28/2022 | 1.0 MB | ||
03-A-001_Partial Architectural Site Plan & Details | 1/28/2022 | 665.2 KB | ||
04-M-101_Generator Replacement Mechanical Demolition | 1/28/2022 | 1.1 MB | ||
05-E-001_Electrical Overall Site Plan | 1/28/2022 | 724.5 KB | ||
06-E-002_Electrical Enlarged Areas of Work | 1/28/2022 | 541.0 KB | ||
07-E-101_Electrical One-Line Diagrams | 1/28/2022 | 504.1 KB |