M2002-01 Repl HVAC System & Controls-Higginsville Habilitation Center

Replacing the existing HVAC system & controls with two new roof top units & two new furnaces. An instantaneous hot water heater will proide domestic hot water. A new supply fan with an electric duct heater will provide makeup air to the dryers.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 12/23/2021 9.7 MB
02-Division 00 12/23/2021 3.6 MB
03-Division 01 12/23/2021 1.3 MB
04-Division 02 12/23/2021 702.0 KB
05-Division 22 12/23/2021 358.1 KB
06-Division 23 12/23/2021 924.5 KB
07-Division 26 12/23/2021 775.9 KB
08-Appendix 12/23/2021 2.7 MB