REBID-X2101-01 Sidewalk & Drainage Improvements First Missouri State Capitol State Historic Site
The project consists of replacement of the flagstone sidewalk with a new sidewalk that facilitates pedestrian activities and site visitation, meets ADA requirements, incorporates improvements to the site interpretive center entrance, and conveys storm water away from the historic structure.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 12/7/2021 | 7.1 MB | ||
01-G-000_Cover Sheet | 12/7/2021 | 355.4 KB | ||
02-G-001_Existing Site Survey | 12/7/2021 | 957.3 KB | ||
03-L-001_Notes & Legends | 12/7/2021 | 451.1 KB | ||
04-L-100_Temporary Traffic Control Plan | 12/7/2021 | 425.8 KB | ||
05-L-110_Demo & Lay-Down Area Plan | 12/7/2021 | 562.8 KB | ||
06-L-111_Materials Plan Base Bid | 12/7/2021 | 882.2 KB | ||
07-L-112_Grading & Drainage Plan Base Bid | 12/7/2021 | 845.2 KB | ||
08-L-113_Lighting Plan Base Bid | 12/7/2021 | 1.5 MB | ||
09-L-120_Demolition Plan Alternate 1 | 12/7/2021 | 392.8 KB | ||
10-L-121_Materials Plan Alternate 1 | 12/7/2021 | 901.5 KB | ||
11-L-122_Grading & Drainage Plan Alternate 1 | 12/7/2021 | 863.8 KB | ||
12-L-123_Tree Planting Plan Alternate 1 | 12/7/2021 | 831.7 KB | ||
13-L-510_Details | 12/7/2021 | 515.2 KB |