M2115-01 Replace Roof-Benton Hall-Nevada Habilitation Center
The work consists of removing existing Modified Bitumen Roof system to the decking & replacing with single-ply thermoplastic polyolefin (TPO), with tapered polyisocyanurate insulation, replacing existing light gauge metal cap with new pre-finished metal coping, replacing existing wall scuppers, conductor heads & downspouts, repair spalled brick, repoint bricks within 24" of each side of downspout.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 10/26/2021 | 20.0 MB | ||
01-G-001_Title Sheet | 10/26/2021 | 1.4 MB | ||
02-G-002_Project Data | 10/26/2021 | 1.8 MB | ||
03-C-001_Site Plan | 10/26/2021 | 1.7 MB | ||
04-A-101_Existing Roof Plan | 10/26/2021 | 2.0 MB | ||
05-A-102_Roof Plan | 10/26/2021 | 2.4 MB | ||
06-A-103_Site Photos | 10/26/2021 | 4.3 MB | ||
07-A-104_Site Photos | 10/26/2021 | 2.3 MB | ||
08-A-501_Roof Scupper & Downspouts Details | 10/26/2021 | 2.3 MB | ||
09-A-502_Roof System Details | 10/26/2021 | 1.9 MB |