M2115-01 Replace Roof-Benton Hall-Nevada Habilitation Center

The work consists of removing existing Modified Bitumen Roof system to the decking & replacing with single-ply thermoplastic polyolefin (TPO), with tapered polyisocyanurate insulation, replacing existing light gauge metal cap with new pre-finished metal coping, replacing existing wall scuppers, conductor heads & downspouts, repair spalled brick, repoint bricks within 24" of each side of downspout.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 10/26/2021 20.0 MB
01-G-001_Title Sheet 10/26/2021 1.4 MB
02-G-002_Project Data 10/26/2021 1.8 MB
03-C-001_Site Plan 10/26/2021 1.7 MB
04-A-101_Existing Roof Plan 10/26/2021 2.0 MB
05-A-102_Roof Plan 10/26/2021 2.4 MB
06-A-103_Site Photos 10/26/2021 4.3 MB
07-A-104_Site Photos 10/26/2021 2.3 MB
08-A-501_Roof Scupper & Downspouts Details 10/26/2021 2.3 MB
09-A-502_Roof System Details 10/26/2021 1.9 MB