OLD R2110-01 HVAC Repairs, Multiple Assets-MSHP General Headquarters

The Project consists of the replacement of the Waggoner Building dual duct air handling unit at the south wing and installation of a new 60 ton air-cooled chiller (exterior of the building). Existing direct-expansion system condenser unit, indoor compressor, and refrigerant piping shall be removed. Existing zone terminal mixing boxes will be replaced with new mixing boxes on the second floor of the south wing general headquarters building. New digital BacNet compatible control system consisting of unit controller interface devices, unit controllers, and temperature sensors will replace the existing digital system and will be fully integrated into the existing Building Management System. The existing 2-pipe roof-mounted air handling units (AHU-3 & AHU 4) with variable speed-controlled supply and return fans are to be replaced with new similar systems (Academy Building). The existing roof dunnage will be utilized to support the new units. Sections of the existing chilled water/hot water hydronic piping located above the central corridor of the Academic Administration building will be replaced. New digital BacNet compatible control system consisting of unit controller interface devices, unit controllers, and temperature sensors will replace the existing digital system and will be fully integrated into the existing Building Management System. Alternate #1: The existing 2-pipe roof mounted air handling unit (AHU-6) with variable speed-controlled supply and return fans are to be replaced with new similar systems (Physical Training Building). The existing roof dunnage will be utilized to support the new units.
Issued for Bid (click to expand/collapse)
Name Date Size
01-G-001_Cover Sheet 9/21/2021 407.9 KB
02-V-100_Topographic Survey Dorm Area 9/21/2021 1.1 MB
03-V-101_Topograohic Survey HQ Building 9/21/2021 935.7 KB
04-A-001_Partial Arch Site Floor Plan WB & General Notes 9/21/2021 496.2 KB
05-M-001_Mechaincal Site Plan 9/21/2021 1.0 MB
06-M-101_Waggoner Building Demo First Floor Plan 9/21/2021 1.3 MB
07-M-102_Waggoner Building Second Floor Plan 9/21/2021 1.4 MB
08-M-103_Waggoner Building Demo Roof Plan 9/21/2021 1.2 MB
09-M-104_Waggoner Building First Fool Plan 9/21/2021 1.7 MB
10-M-105_Waggoner Building Second Floor Plan 9/21/2021 1.3 MB
11-M-106_Academy Administration Demo First Floor Plan 9/21/2021 1.4 MB
12-M-107_Academy Administration Demo Roof Plan 9/21/2021 1.2 MB
13-M-108_Academy Administration First Floor Plan 9/21/2021 1.2 MB
14-M-109_Academy Administration Roof Plan 9/21/2021 1.2 MB
15-M-110_Physical Training Demo Roof Plan 9/21/2021 1.4 MB
16-M-111_Physical Training Roof Plan 9/21/2021 1.4 MB
17-M-601_Mechanical General Notes & Legend 9/21/2021 832.8 KB
18-M-602_Waggoner Building Mechanical Schedules & Details 9/21/2021 840.7 KB
19-M-603_Mechanical Schedules & Details 9/21/2021 1.0 MB
20-M-604_WB Mechanical Diagrams & Sequence of Control 9/21/2021 1.0 MB
21-M-605_WB Mechanical Diagrams & Sequence of Control 9/21/2021 1.0 MB
22-M-606_AA PT _WB Mechanical Diagrams & Sequence of Control 9/21/2021 1.0 MB
23-M-607_Mechanical Schedules & Details 9/21/2021 1.0 MB
24-E-101_Waggoner Building Elec First Floor Plan 9/21/2021 607.3 KB
25-E-102_Waggoner Building Second Floor Plan 9/21/2021 1.1 MB
26-E-103_Academy Administration Elec First Floor Plan 9/21/2021 704.5 KB
27-E-104_Physical Training Elec Demo & New Roof Plans 9/21/2021 622.7 KB
28-E-601_Electrical Equipment Data Schedule 9/21/2021 799.5 KB