O2115-01 State of Missouri Public Health Laboratory Renovation

The project includes the renovation of selective laboratory spaces within the first floor Biosafety Level 3 (BSL-3) & third floor (non BSL-3) environments. the spaces will receive new ceilings, new flooring, power & data cabling, and will be reconfigured with new modular laboratory work tables. the facility will remain fully operational during the extent of the renovation work.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 8/12/2021 23.9 MB
01-G-001_Cover Sheet 8/12/2021 694.4 KB
02-G-002_Code Info Notes and Wall Types 8/12/2021 610.7 KB
03-A-101_First and Third Floor Reference Plans 8/12/2021 594.9 KB
04-A-102_First Second and Third Floor Demo Plans 8/12/2021 667.1 KB
05-A-103_First and Third Floor Temporary Controls Plans 8/12/2021 578.2 KB
06-A-104_First Floor Plan with Second Floor Curb Overlay 8/12/2021 515.4 KB
07-A-105_First and Third Floor Finish Plans 8/12/2021 571.9 KB
08-A-201_Elevations 8/12/2021 717.0 KB
09-A-401_Enlarged Plans First Floor Partial Second Floor Plan 8/12/2021 692.7 KB
10-A-402_Enlarged Plans Sections Details Third Floor 8/12/2021 547.2 KB
11-A-501_Laboratory Details 8/12/2021 456.1 KB
12-A-502_Laboratory Details and Sink Schedule 8/12/2021 2.1 MB
13-A-601_Schedules and Details 8/12/2021 939.0 KB
14-A-602_Project Timeline and Phasing 8/12/2021 585.0 KB
15-A-701_First and Third Floor Demo Reflected Ceiling Plans 8/12/2021 910.4 KB
16-A-702_First and Third Floor Reflected Ceiling Plans 8/12/2021 1.0 MB
17-PM000_Symbols Abbrevs and General Notes 8/12/2021 783.0 KB
18-P101_First and Third Floor Reference Plumbing Plans 8/12/2021 1.0 MB
19-PD401_Enlarged First Floor Plumbing Demo Plans 8/12/2021 920.0 KB
20-P401_Enlarged First Floor Plumbing Plans 8/12/2021 890.1 KB
21-P403_Enlarged Second and Third Floor Plumbing Plans 8/12/2021 830.9 KB
22-M101_First and Third Floor Reference Mech Plans 8/12/2021 1.0 MB
23-MD401_Enlarged First Floor Mech Demo Plans 8/12/2021 890.1 KB
24-MD403_Enlarged Second and Third Floor Mech Demo Plans 8/12/2021 818.2 KB
25-M401_Enlarged First Floor Mech Plans 8/12/2021 895.3 KB
26-M403_Enlarged Second and Third Floor Mech Plans 8/12/2021 857.2 KB
27-PM500_Plumbing and Mechanical Details 8/12/2021 705.1 KB
28-PME600_Plumbing and Mechanical Schedules 8/12/2021 716.6 KB
29-M601_First and Third Floor Mech Pressurization Plans 8/12/2021 882.1 KB
30-E000_Symbols Abbrevs and General Notes 8/12/2021 800.3 KB
31-E101_Overall First and Second Floor Power and Communications Plans 8/12/2021 1.3 MB
32-E102_Overall Third Floor Power and Communications Plan 8/12/2021 917.1 KB
33-ED401_Enlarged First Floor Power and Communications Demo Plans 8/12/2021 922.3 KB
34-ED402_Enlarged First Floor Power and Communications Demo Plans 8/12/2021 947.3 KB
35-ED403_Enlarged Third Floor Power and Communications Demo Plans 8/12/2021 822.2 KB
36-E401_Enlarged First Floor Power and Communications Plans 8/12/2021 937.3 KB
37-E402_Enlarged Third Floor Power and Communications Demo Plans 8/12/2021 921.5 KB
38-E403_Enlarged Third Floor Power and Communications Plans 8/12/2021 885.1 KB
39-EL101_Overall First and Third Floor Lighting Plans 8/12/2021 1.2 MB
40-ELD401_Enlarged First Floor Lighting Demo Plans 8/12/2021 932.4 KB
41-ELD403_Enlarged Third Floor Lighting Plans 8/12/2021 853.4 KB
42-EL401_Enlarged First Floor Lighting Plans 8/12/2021 909.9 KB
43-EL403_Enlarged Third Floor Lighting Plans 8/12/2021 843.2 KB
44-E500_Electrical Details 8/12/2021 712.5 KB
45-E501_Partial Existing One Line Diagram 8/12/2021 764.3 KB
46-E502_Partial Existing One Line Diagram 8/12/2021 760.8 KB