X2002-02 Stream Bank Restoration Phase II Castlewood State Park

The project includes bank stabilization and riparian buffer planting. The work includes the uprooting and processing if trees left standing in the disturbance limits, installation of boulder toe with brush layering, on-site transportation and installation of root wads, and native riparian vegetation installation.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 7/21/2021 9.5 MB
02-Division 00 7/21/2021 2.8 MB
03-Division 01 7/21/2021 1.0 MB
04-Division 31 7/21/2021 731.7 KB
05-Division 32 7/21/2021 283.8 KB
06-Appendices 7/21/2021 4.5 MB