X2002-02 Stream Bank Restoration Phase II Castlewood State Park
The project includes bank stabilization and riparian buffer planting. The work includes the uprooting and processing if trees left standing in the disturbance limits, installation of boulder toe with brush layering, on-site transportation and installation of root wads, and native riparian vegetation installation.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
01-Full Spec | 7/21/2021 | 9.5 MB | ||
02-Division 00 | 7/21/2021 | 2.8 MB | ||
03-Division 01 | 7/21/2021 | 1.0 MB | ||
04-Division 31 | 7/21/2021 | 731.7 KB | ||
05-Division 32 | 7/21/2021 | 283.8 KB | ||
06-Appendices | 7/21/2021 | 4.5 MB |