X2002-02 Stream Bank Restoration Phase II Castlewood State Park
The project includes bank stabilization and riparian buffer planting. The work includes the uprooting and processing if trees left standing in the disturbance limits, installation of boulder toe with brush layering, on-site transportation and installation of root wads, and native riparian vegetation installation.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 7/21/2021 | 14.2 MB | ||
01-G-001_Cover Sheet | 7/21/2021 | 366.2 KB | ||
02-G-002_General Notes | 7/21/2021 | 1.5 MB | ||
03-C-101_Alignment Layout & Control Points | 7/21/2021 | 807.9 KB | ||
04-C-102_Alignment Table | 7/21/2021 | 408.9 KB | ||
05-C-103_Kiefer Creek Proposed Plan & Profile | 7/21/2021 | 2.3 MB | ||
06-C-104_Typical Cross Sections | 7/21/2021 | 396.1 KB | ||
07-C-105_Proposed Cross Sections | 7/21/2021 | 464.3 KB | ||
08-C-106_Proposed Cross Sections | 7/21/2021 | 437.3 KB | ||
09-C-107_Proposed Cross Sections | 7/21/2021 | 444.8 KB | ||
10-C-108_Planting Plan | 7/21/2021 | 2.7 MB | ||
11-C-109_Planting Tables | 7/21/2021 | 839.2 KB | ||
12-C-110_Details | 7/21/2021 | 624.9 KB | ||
13-C-111_Details | 7/21/2021 | 1.1 MB | ||
14-C-112_Details | 7/21/2021 | 572.3 KB | ||
15-C-113_Details | 7/21/2021 | 1.0 MB | ||
16-C-114_Erosion & Sediment Control Plan | 7/21/2021 | 2.9 MB | ||
17-C-115_Erosion & Sediment Control Notes | 7/21/2021 | 936.1 KB |