X2002-02 Stream Bank Restoration Phase II Castlewood State Park

The project includes bank stabilization and riparian buffer planting. The work includes the uprooting and processing if trees left standing in the disturbance limits, installation of boulder toe with brush layering, on-site transportation and installation of root wads, and native riparian vegetation installation.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 7/21/2021 14.2 MB
01-G-001_Cover Sheet 7/21/2021 366.2 KB
02-G-002_General Notes 7/21/2021 1.5 MB
03-C-101_Alignment Layout & Control Points 7/21/2021 807.9 KB
04-C-102_Alignment Table 7/21/2021 408.9 KB
05-C-103_Kiefer Creek Proposed Plan & Profile 7/21/2021 2.3 MB
06-C-104_Typical Cross Sections 7/21/2021 396.1 KB
07-C-105_Proposed Cross Sections 7/21/2021 464.3 KB
08-C-106_Proposed Cross Sections 7/21/2021 437.3 KB
09-C-107_Proposed Cross Sections 7/21/2021 444.8 KB
10-C-108_Planting Plan 7/21/2021 2.7 MB
11-C-109_Planting Tables 7/21/2021 839.2 KB
12-C-110_Details 7/21/2021 624.9 KB
13-C-111_Details 7/21/2021 1.1 MB
14-C-112_Details 7/21/2021 572.3 KB
15-C-113_Details 7/21/2021 1.0 MB
16-C-114_Erosion & Sediment Control Plan 7/21/2021 2.9 MB
17-C-115_Erosion & Sediment Control Notes 7/21/2021 936.1 KB